Rail & Road
HBL Power Systems bags Rs 54 crore KAVACH project contract from West Central Railway – Industry News

HBL Power Systems has secured a contract worth Rs 54.12 crore from West Central Railway for installing the indigenous train protection system, KAVACH, in the Kota division. The contract includes survey, design, supply, installation, testing, and commissioning of trackside KAVACH equipment.
HBL wins 700-day railway safety upgrade contract
The work will be carried out in the Kota-Ruthiyai section and the Sogaria-Kota “C” section, covering a total distance of 166 kilometres. The project also involves installing KAVACH at 18 stations and level crossing gate locations, along with erecting towers and other associated works.
The contract is to be completed within 700 days from the date of commencement. HBL confirmed that none of its promoters have any interest in the awarding entity and that the order does not fall under related party transactions.
Boost to rail safety
KAVACH is an automatic train protection system designed to enhance railway safety by preventing signal passing at danger and avoiding collisions. West Central Railway’s adoption of this system is expected to further strengthen operational safety in the region.
The company informed exchanges that the order value includes 18 per cent GST and has been awarded by a domestic entity.
Rail & Road
Keeping rail projects on track: how smart safety solutions are powering the UK’s infrastructure boom

With major infrastructure projects such as HS2 driving demand, rail improvement sites across the UK are under pressure to deliver safely, efficiently and without delay.
Behind the scenes it’s the logistics, planning and safety solutions that keep everything moving.
Here are seven top tips from Paul Goossens, operations director at SafeSite Facilities, to ensure a rail improvement project stays on track.
1. Offloading made easy – even on the toughest sites
Offloading is one of the biggest challenges on rail projects. That’s why truck-mounted forklifts and crane-equipped vehicles are key to handle the most complex deliveries.
Whether it’s a narrow roadside drop or a night-time install, it’s important to coordinate every detail to ensure materials are delivered and installed without delay. Remember it can take a long time to offload from a delivery vehicle.
2. Preventing unauthorised access: people and wildlife
Rail sites should be protected with a wide range of fencing which can prevent people and animals from accessing the site.
Wildlife fencing can even prevent animals from burrowing into the site and helps to ensure the construction industry protects wildlife.
These preventative measures are essential for safety and compliance. There are multiple options, including fencing, concrete and water-filled barriers to consider.
3. CCTV: protecting lives and reputations
Modern CCTV systems boast thermal imaging and AI detection, which provide real-time alerts and can trigger public address warnings to prevent accidents.
They can monitor site safety which can reduce the risk of accidents and deter young people and trespassers from entering a construction site.
Enjoying this article? Sign up for our FREE newsletter!
4. Built for high winds and heavy impact
Fencing systems with ballast are designed to withstand extreme conditions, including high winds, ensuring the site remains secure even in bad weather.
Ballast blocks and crash barriers ensure stability and safety, even in exposed or high-traffic areas.
5. Planning and compliance at every stage
Every delivery must be backed by detailed documentation to ensure it goes off without a hitch.
This includes driver IDs, vehicle MOTs, training certificates and lift plans for cranes which will be used to offload.
For projects like HS2, where 24-hour booking systems and strict access routes are expected, this level of planning is essential.
6. Speed and flexibility when it matters most
It’s crucial that delivery services can meet urgent site needs, ensuring that materials and equipment are available when required to prevent site closures and work stoppages.
Choose operators close to the site which can deliver urgently needed materials within 24 hours.
Whether it’s a last-minute request to secure a dangerous area or a planned overnight install, they should be ready to respond, delivering and installing within a single shift so the team can operate safely.
7. Risk assessment and expert advice
Before any order is confirmed, a full risk assessment should be completed with advice on the safest and most efficient solution presented.
If a delivery or installation is too risky, it’s crucial to communicate this and help find a better alternative.
For more information, visit: https://www.safesitefacilities.co.uk
Rail & Road
ORR serving up rail development on a plate

There is a strong appetite to invest in rail. However, barriers hold back the market, says the official regulator in the UK. The Office of Rail and Road (ORR) has conducted a review that reveals latent opportunities for rail infrastructure investment. Work is now underway at the regulator to remove barriers and streamline the investment process to support economic growth.
Subscribe to gain access to all news
Already have a subscription? Log in.
Choose your subscription
Or
Want to read this article for free?
You can read one free article per month. Enter your email and we’ll send you a free link to access the full article. No payment required.
Rail & Road
BEML Secures First International Rail-Metro Contract in Malaysia for ₹1 Million, ETInfra

State-owned firm BEML Limited has received its maiden overseas contract in the rail and metro segment from Malaysia valued at ₹1 million.
The work is for the retrofit and reconditioning of the Mass Rapid Transport System, according to a company stock exchange filing.
“…we hereby inform that BEML Limited received its maiden overseas contract in the Rail and Metro segment from Malaysia for the Retrofit and Reconditioning of the Mass Rapid Transport System on 09.08.2025, valued at ₹1 million,” the company informed stock exchanges.
BEML Limited, a leading multi-technology ‘Schedule A’ company under the Ministry of Defence, plays a pivotal role in serving India’s core sectors, including defence, rail, power, mining, and construction, by offering world-class products.
BEML operates in three verticals: Defence and aerospace, mining and construction, and rail and metro. It has state-of-the-art manufacturing facilities located in Bengaluru, Kolar Gold Fields (KGF), Mysore, and Palakkad, with a strong R&D infrastructure and a nationwide sales and service network.
Separately, in early July, BEML Limited inaugurated its newly built state-of-the-art warehousing facility, spread over 0.12 acres, at the Karnataka Industrial Areas Development Board (KIADB) Aerospace Special Economic Zone (SEZ), Bengaluru.
This marked a significant milestone in BEML’s long-term vision of supporting India’s aerospace growth and creating a robust supply chain ecosystem for global and domestic Original Equipment Manufacturers (OEMs).
The facility is designed not only to support BEML’s internal logistics, but also to offer warehousing and allied services to other OEMs, Tier-1, and Tier-2 players.
BEML envisions to create a Centre of Excellence for Aerospace Technologies within this SEZ, empowering India’s self-reliance journey in defence and aerospace while creating a vibrant ecosystem for innovation, collaboration, and growth.
-
Brand Stories3 weeks ago
Bloom Hotels: A Modern Vision of Hospitality Redefining Travel
-
Brand Stories2 weeks ago
CheQin.ai sets a new standard for hotel booking with its AI capabilities: empowering travellers to bargain, choose the best, and book with clarity.
-
Destinations & Things To Do3 weeks ago
Untouched Destinations: Stunning Hidden Gems You Must Visit
-
Destinations & Things To Do2 weeks ago
This Hidden Beach in India Glows at Night-But Only in One Secret Season
-
AI in Travel3 weeks ago
AI Travel Revolution: Must-Have Guide to the Best Experience
-
Brand Stories1 month ago
Voice AI Startup ElevenLabs Plans to Add Hubs Around the World
-
Brand Stories3 weeks ago
Contactless Hospitality: Why Remote Management Technology Is Key to Seamless Guest Experiences
-
Brand Stories1 month ago
How Elon Musk’s rogue Grok chatbot became a cautionary AI tale
-
Asia Travel Pulse1 month ago
Looking For Adventure In Asia? Here Are 7 Epic Destinations You Need To Experience At Least Once – Zee News
-
AI in Travel1 month ago
‘Will AI take my job?’ A trip to a Beijing fortune-telling bar to see what lies ahead | China
You must be logged in to post a comment Login